Twoop|Forrabury and Minster
NewsEventsDealsDirectoryCommunitySkilled LocalsRoadworksPlanningCouncilTrainsBusesAbout
  1. Twoop
  2. South West England
  3. Forrabury and Minster
  4. Post

Twoop: Forrabury and Minster

Local news, events, deals, and community updates for Forrabury and Minster.

Forrabury and Minster

  • News
  • Events
  • Deals
  • Community Board
  • Business Directory
  • Skilled Locals

Explore

  • South West England area
  • All communities
  • Twoop home

Get Involved

  • Submit an Event
  • Share a Post
  • Register as a Local
  • About Forrabury and Minster
© 2026 Twoop. All rights reserved.
  • Home
  • News
  • Events
  • Directory
  • Community
Back to Planning
Planningvia Cornwall Council Planning

Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add...

15 May 2026

Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines to

Install approximately 260mtrs of 11kV UG cable from pole 43LP7 to 45LP8 as shown on the attached plan 5853236s37. Add 43LP8 to network to create new terminal 11kV pole to support new overhead lines towards 43LP11 and connect to new UG cable from 43LP7. Replace pole 43LP11 and construct as a double terminal pole with addition of one new stay to have two stays on pole. Dismantle existing overhead line between 43LP7 and 43LP11 as shown highlighted blue on the attached plan and remove any redundant poles. Address: Trewinnick Farm Trewinnick Tintagel Cornwall PL34 0HL Ref: PA26/03364 Type: Overhead Electricity Lines Status: Awaiting decision Ward: St Teath And Tintagel
Read full article at Cornwall Council Planning

Comments

No comments yet. Be the first to share your thoughts!